top of page

NBK NEW HEADQUARTERS
Kuwait (Kuwait), 2019
Work Developed for
SÍNDAR WOOSOLUTIONS
Developement and headship of Industrial Project
Technical design, fabrication, shipping and installation of Millwork for 4 floors at the new NBK headquartes Building.
2 floor Wall panelling for Ballroom. Made out of different measurement Wenge veneered solid wood strips. Including 16 access pannels and 2 openings for audio-video systems.
Up to building code Wall Claddings for concourses, landings and hallways in 4 storeys.
Oak "Marotte" stained veneered panelling
16 doors up to building code (Soundproof, formaldehyde free, and fire resistant ) Upon existing drawings.
* As subjected to a non-disclosure agreement I can´t post but public access images from the Web.
![]() | ![]() IMG-20181221-WA0012 |
---|---|
![]() IMG-20181202-WA0003 | ![]() IMG-20181202-WA0004 |
![]() IMG-20181212-WA0010 | ![]() IMG-20181221-WA0014 |
![]() IMG-20181212-WA0015 | ![]() |
bottom of page